Hi,
I am trying to support a customer with very old code in Lookout 4.0.1. What I need to do is get one Pot control to update the value in another. They have this in place already and I have tried to copy how this is done but when I do this by adding a new control (Pot Object) and setting the value parameter (right click, edit connections.. in Connection Browser) to the other control it does not update. I suspect I have missed a parameter somewhere but I don't know what it is!!
If anyone could guide me I would be very grateful
Kevin